Skip to main content
Publi image
Publi data
Soolyeon Cho and Jeff S. Haberl
Languages
English
Bibliographic info
Building Simulation, 2009, Glasgow, Scotland

This paper presents the results of implementing 14 high-performance measures in a prototypical office building in a hot and humid climate using the DOE-2 simulation program. The objectives of this research were to discover high-performance measures applicable to office buildings in hot and humid climates and to develop a high-performance (maximum energy-efficient) building model that only uses technologies readily available in the contemporary market. The high-performance model showed 48% total energy savings above the ASHRAE 90.1-1999 code and 61% savings when compared to the calibrated simulation model of the case-study building. The results show that substantial energy savings can be achieved only by using common technologies.